20110731

Green. Building. Solutions.

Aspen Urban Lakeside Masterplan with Peter Hinterkorner

  • Net area: 100ha
  • Development period: 20 years
  • Planned gross floor space: 2.2 million sq.m
  • Housing: 8,500 flats for 20,000ppl
  • Working: 20,000 workplaces
  • AESU – Handbook for sustainable city.
  • Neutral Buildings - good idea for future adaptability and long life cycle
  • Medium density living, mixed use buildings with public space connections
  • vehicular access reduced, communal carparks "every car user is a pedestrian on their way to a car"
  • Urban development where they put a lot of work into defining the marketing strategies and providing the guidelines for what should be constructed on individual sites. However there is always room for the developer to take the minimum standard.